DRALOD project is impacted by the COVID-19 lockdown. The lockdown has occurred during the DRALOD pilot plant installation phase. Supply of components for the installation of the solar roof, the drying system and auxiliary subsystems, as well as the installation activities themselves, were suspended. A project extension of 6 months has been accepted by the Commission, in consideration for this situation. The ending date of this project is 30 June 2021.