FINAL PROJECT MEETING

FINAL PROJECT MEETING

FINAL PROJECT MEETING The DRALOD Project held its final Consortium meeting on 4th June, 2021. Representatives of the 4 participant entities joined in an online meeting to define the final steps of this project. Due to the Covid-19 emergency, a face to face consortium...
SCIENTIFIC PUBLICATION BY DBFZ

SCIENTIFIC PUBLICATION BY DBFZ

SCIENTIFIC PUBLICATION BY DBFZ The research team at DBFZ has published an interesting study on sustainability and cost effectiviness of the DRALOD drying plant concept: Mutlu, Ö. Ç., Büchner, D., Theurich, S., & Zeng, T. (2021). Combined Use of Solar and Biomass...
HEAT RECOVERY UNIT BY RISE

HEAT RECOVERY UNIT BY RISE

HEAT RECOVERY UNIT BY RISE The research team at RISE has finalised the construction of the Heat Recovery Unit (HRU) prototype. It is a small scale unit designed for the project to allow a proof of concept with a scrubber and heat pump for a new application such as the...
5th PROJECT MEETING

5th PROJECT MEETING

5th PROJECT MEETING The DRALOD Project held its 5th Consortium meeting on November 27, 2020.Tweleve representatives of the 4 participant entities joined in an online meeting to discuss and define the first steps of the project. The meeting started with the R&D...
INSTALLATION OF BIOMASS BOILER IN THE PILOT PLANT

INSTALLATION OF BIOMASS BOILER IN THE PILOT PLANT

INSTALLATION OF BIOMASS BOILER IN THE PILOT PLANT The installation of the ÖKOTHERM® compact biomass boiler of 950kW is on- going. It is designed for an optimised performance as part of the DRALOD drying plant. Biomass energy will be used combined with solar thermal...